| 1.Quote |
According to sample, drawing and specific requirement. |
| 2.Discussion |
Mold material, cavity number, price, runner, payment, etc. |
| 3.S/C Signature |
Approval for all the items |
| 4. Advance |
Pay 30% |
| 5.Product Design Checking |
We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
| 6.Mould Design |
We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
| 7.Mold Testing |
Send trial samples and try-out report to customer for confirmation |